Location: | Jincheng, Shanxi |
Installed Engines: | 2 x LY1200 |
Power Output: | 2.2 MW |
Energy Source: | Hign-concentration gas |
Commissioned: | 2019 |
Location: | Fengzhen, Inner Mongolia |
Installed Engines: | 22 x LY1600(1st Phase);11 x LY1600(2nd Phase) |
Power Output: | 26.4 MW |
Energy Source: | Industrial gas |
Commissioned: | 2022 (1st Phase), 2024 (2nd Phase) |