      Liyu’s projects, totaling over 1000MW in capacity, produce nearly 8 billion kWh of green electricity each year. This effort reduces CO2 emissions by more than 10 million tons annually and delivers approximately RMB 5 billion in energy savings and emission reductions.
      ?
      Biogas
      Huochier Biomass (CHN)
      CONVERTING BIOMASS GAS INTO 8 MILLION kWh OF RENEWABLE ELECTRICITY
      for resolving tar challenges, enhancing efficiency, and promoting sustainable energy solutions
      Location: Chengdu, Sichuan
      Installed Engines: 1 x LY1200
      Power Output: 1 MW
      Energy Source: Biomass gas
      Commissioned: 2019
      Zhenghe Agriculture (CHN)
      CONVERTING AGRICULTURAL WASTE INTO 8.8 MILLION kWh OF CLEAN ENERGY
      for enhanced energy efficiency, reduced environmental impact, and sustainable agricultural practices
      Location: Xinyu, Jiangxi
      Installed Engines: 1 x LY1200
      Power Output: 1 MW
      Energy Source: Biomass gas
      Commissioned: 2019
      Coalbed Methane
      Shangshe (CHN)
      TRANSFORMING LOW-CONCENTRATION GAS INTO SUSTAINABLE ENERGY
      for improved efficiency, reduced emissions, and cost-effective power solutions
      Location: Yangqaun, Shanxi
      Installed Engines: 30 x LY1200
      Power Output: 30 MW
      Energy Source: Low-concentration gas
      Commissioned: 2018
      Baoli (CHN)
      GENERATING 6 MW FROM LOW-CONCENTRATION GAS
      for increased power output, enhanced efficiency, and cost-effective energy solutions
      Location: Yangqaun, Shanxi
      Installed Engines: 6 x LY1200
      Power Output: 6 MW
      Energy Source: Low-concentration gas
      Commissioned: 2020
      Guandi (CHN)
      Generating clean energy from low-concentration gas at Guandi.
      ?
      Location: Guandi, Shanxi
      Installed Engines: 4 x LY1200
      Power Output: 4 MW
      Energy Source: Low-concentration gas
      Commissioned: 2021
      Shanghuang (CHN)
      HARNESSING COAL MINE METHANE INTO 9.6 MILLION kWh OF CLEAN ENERGY
      for improved energy efficiency, reduced greenhouse gas emissions, and enhanced resource utilization
      Location: Jincheng, Shanxi
      Installed Engines: 2 x LY1200
      Power Output: 2.2 MW
      Energy Source: Hign-concentration gas
      Commissioned: 2019
      Furnace Gases
      Mengfa (CHN)
      CONVERTING INDUSTRIAL BY-PRODUCTS INTO 16.8MW OF CLEAN ENERGY
      for lower energy costs, greater reliability, and reduced emissions
      Location: Eerduosi, Inner Mongolia
      Installed Engines: 14 x LY1600
      Power Output: 16.8 MW
      Energy Source: Ferroalloy exhaust
      Commissioned: 2022
      Fengyu (CHN)
      CONVERTING INDUSTRIAL WASTE INTO CLEAN ENERGY
      for lower energy costs, greater reliability, and reduced emissions
      Location: Fengzhen, Inner Mongolia
      Installed Engines: 22 x LY1600(1st Phase);11 x LY1600(2nd Phase)
      Power Output: 26.4 MW
      Energy Source: Industrial gas
      Commissioned: 2022 (1st Phase), 2024 (2nd Phase)
      Deyixing (CHN)
      CONVERTING INDUSTRIAL TAIL GAS INTO 153 MILLION kWh OF CLEAN ENERGY
      for reduced energy costs, lower carbon emissions, and enhanced sustainability
      Location: Baise, Guangxi
      Installed Engines: 16 x LY1600
      Power Output: 19.2 MW
      Energy Source: Industrial gas
      Commissioned: 2023
      Kehan (CHN)
      CONVERTING INDUSTRIAL TAIL GAS INTO 14.4 MW OF CLEAN ENERGY
      for improved energy efficiency, lower emissions, and enhanced sustainability
      Location: Fengzhen, Inner Mongolia
      Installed Engines: 12 x LY1600
      Power Output: 14.4 MW
      Energy Source: Industrial gas
      Commissioned: 2022 
      Landfill Gas
      Qiganshi Landfill
      CONVERTING LANDFILL GAS INTO RENEWABLE ELECTRICITY
      for enhanced efficiency, improved landfill management, and green development
      Location: Jiangmen, Guangdong
      Installed Engines: 5 x LY1600 & 6 x LY1200
      Power Output: 13.5 MW
      Energy Source: Landfill gas (biogas)
      Commissioned: 2023
      Bili Dam Landfill (CHN)
      CONVERTING LANDFILL GAS INTO 108 MILLION kWh OF RENEWABLE ELECTRICITY
      for reduced coal usage, lower carbon emissions, and enhanced sustainability
      Location: Guiyang
      Installed Engines: 7 x LY1600 & 3 x LY1200
      Power Output: 10 MW
      Energy Source: Landfill gas (biogas)
      Commissioned: 2022
      Bainikeng Landfill(CHN)
      UTILIZING LANDFILL GAS TO PRODUCE 4 MILLION kWh OF RENEWABLE ELECTRICITY 
      for reduced coal usage, lower carbon emissions, and enhanced sustainability
      Location: Foshan, Guangdong
      Installed Engines: 4 x LY1200
      Power Output: 4 MW
      Energy Source: Landfill gas
      Commissioned: 2022
      Pingdi Biogas (CHN)
      CONVERTING LANDFILL GAS INTO 7.2 MILLION kWh OF CLEAN ENERGY
      for improved energy efficiency, reduced emissions, and enhanced sustainability
      Location: Shenzhen
      Installed Engines: 2 x LY1200
      Power Output: 1.9 MW
      Energy Source: Landfill gas
      Commissioned: 2021
      Natural gas
      Huanghua Airport (CHN)
      SUPPLYING AIRPORTS WITH CONSISTENT POWER USING NATURAL GAS
      for reliable performance, uninterrupted operations, and enhanced efficiency
      Location: Changsha
      Installed Engines: 1 x LY1200
      Power Output: 1 MW
      Energy Source: Natural gas
      Commissioned: 2011
      Rongcheng Garden Hotel (CHN)
      CONVERTING NATURAL GAS INTO 4.224 MILLION kWh OF CLEAN ENERGY
      for optimized energy use, reduced coal consumption, and enhanced reliability
      Location: Changsha, Hunan
      Installed Engines: 3 x LY1200
      Power Output: 3.6MW
      Energy Source: Natural gas
      Commissioned: 2015
      Sewage Gas
      Hongying (CHN)
      CONVERTING BIOGAS INTO 12 MILLION kWh OF CLEAN ENERGY
      for improved efficiency, lower environmental impact, and sustainable operations
      Location: Changde, Hunan
      Installed Engines: 2 x LY1200
      Power Output: 12 MW
      Energy Source: Sewage Gas
      Commissioned: 2019
      Renke (CHN)
      CONVERTING BIOGAS INTO RENEWABLE ELECTRICITY
      for enhanced energy efficiency, reduced environmental impact, and sustainable urban development
      Location: Jiangmen, Guangdong
      Installed Engines: 1 x LY1200
      Power Output: 1MW
      Energy Source: Sewage Gas
      Commissioned: 2021
      More Offerings

      Service

      End-to-end support from consultation to maintenance with advanced technology and expert teams.

      Gas Engines

      Efficient gas generators (900kW to 2000kW) for power, cooling, and heating with 30 years of innovation.

      Energy Solutions

      Flexible, scalable, and eco-friendly energy solutions to achieve your goals and support sustainability.

      Ready to Power a Sustainable Future?

      Contact us to advance your energy goals with our innovative gas power solutions. Whether you need on-site power, cost optimization, or new electricity options, we're here to assist.
      Consult with our expert

      Telephone

      +86-0731-8873 0808
      ?Copyright ? 2024 Liyu Group. All Rights Reserved. SitemapPrivacy Policy

      Power Products

      Energy Solutions

      Services

      About

      Subscribe to our newsletter

      Promotions, new products and sales. Directly to your inbox.